Step-By-Step Guide

Image

 

1. Moisture analysis of your property
As a first step of the process, a professional visits your home and carries out a moisture analysis. If we judge Dry Power to be a suitable solution, we proceed with the installation in order to dry your house.

2. Installation
Electrode plugs are placed into holes at intervals of 50 to 100 cm and at a height of 10 to 50 cm from the floor. The control box emits electrical impulses that charge the water molecules and forces them to migrate towards the soil and out of the wall. The electrodes can also be installed externally, just above ground level.

3. Guaranteed result
The moisture content is measured during installation, and the buyer and installer draw up an agreement. A new measurement is made within approx. 30 days, and the results are compared. Wall materials and ground conditions vary, and the test period must show if the system works on your property. If the result is not satisfactory, the ion generator is removed and you do not have to pay. If the wall is now dry, we give 30-year functional warranty.